some work done lately
I've been working on the alternate static control thats down on the left wall next to the pilots leg.
this was a challenge as it involved a curved insert into the wall.
first I made the mold

then melted a layer of plastic with the heat gun and squashed it into shape

then added a little weight while it cooled

and there is the basic shape

while waiting I cut out the hole in the pit wall

after cutting out the final shape "carefully" and giving it a few layers of paint it's starting to look the goods

added some screws and a lever made from mdf and gloss red marine paint

and there you have it - a lot of work that doesn't look much but will look better once the carpet etc is added

this is the first attempt at the signage but I may have to have another try at this as I'm not really pleased with this result. also the shakey photography doesn't help

I've been working on the alternate static control thats down on the left wall next to the pilots leg.
this was a challenge as it involved a curved insert into the wall.
first I made the mold
then melted a layer of plastic with the heat gun and squashed it into shape
then added a little weight while it cooled
and there is the basic shape
while waiting I cut out the hole in the pit wall

after cutting out the final shape "carefully" and giving it a few layers of paint it's starting to look the goods

added some screws and a lever made from mdf and gloss red marine paint

and there you have it - a lot of work that doesn't look much but will look better once the carpet etc is added

this is the first attempt at the signage but I may have to have another try at this as I'm not really pleased with this result. also the shakey photography doesn't help